Journal of Guangdong University of Technology ›› 2007, Vol. 24 ›› Issue (2): 107-110.

• Comprehensive Studies • Previous Articles    

The Fast Dynamic Algorithm of the Cost of Construction Based on Fuzzy Mathematics

  

  1. (1.Department.of Civil Engineering and Architecture,Northwestern Polytechnical University,Xi’an 710072,China;2.The Fourth Academy of Aerospace Science & Technology Corporation,Xi’an 710025,China;3.Building Industry Company of Xiangfan of Wuhan Railway Bureau,Xiangfan 441003,China)
  • Online:2007-07-02 Published:2007-07-02

Abstract: Based on the method of fuzzy mathematics,the similarity of the projects completely built and to be built is studied,and eight factors affecting the cost of the project have been proposed.All the eigenfunctions and the approaches of the project completely built are calculated in this paper.According to the fabrication cost of the project being built,the fabrication cost of the project to be built can be determined accurately and rapidly.

Key words: fuzzy theory; cost of construction; project to be built;

[1] 郑周练,邓绍江,高师娴,谭德精,钟凯玲.  建筑工程造价的模糊确定[J]. 重庆大学学报(自然科学版). 2001(01)

[2] 张炜,王亚平,林杰.  工程合理成本的模糊估测模型及应用研究[J]. 铁道学报. 1998(03)

[3] 谢贤平.  土建工程造价估算的模糊数学方法[J]. 有色金属设计. 1996(01)
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!