广东工业大学学报 ›› 2023, Vol. 40 ›› Issue (01): 92-99,136.doi: 10.12052/gdutxb.220118

• • 上一篇    下一篇

基于延迟时间模型的船舶预防性机会维修策略

李冀晖, 黄锦敬, 崔春强   

  1. 湛江科技学院 智能制造学院,广东 湛江 524094
  • 收稿日期:2022-07-11 出版日期:2023-01-25 发布日期:2023-01-12
  • 作者简介:李冀晖(1985-),男,讲师,硕士,主要研究方向为机电设备可靠性及维修决策,E-mail:449249380@qq.com
  • 基金资助:
    广东省教育厅青年创新人才项目(2018KQNCX381);广东省普通高校特色创新类项目(2021KTSCX170);湛江市非资助科技攻关计划项目(2021B01514)

Ship Preventive Opportunistic Maintenance Strategy Based on Delay Time Model

Li Ji-hui, Huang Jin-jing, Cui Chun-qiang   

  1. College of Intelligent Manufacturing, Zhanjiang University of Science and Technology, Zhanjiang 524094, China
  • Received:2022-07-11 Online:2023-01-25 Published:2023-01-12

摘要: 针对目前船舶关键部件维修不合理导致的维修费用过高、使用率低的问题,提出基于延迟时间理论的船舶关键部件预防性维修策略。该策略以各部件的定期检测为基础,根据缺陷阶段和故障阶段的不同特点,将各部件维修分为检测维修和延迟维修,在延迟阶段引入机会维修思想,建立了船舶关键部件机会维修模型。根据部件检测维修记录和故障数据,运用极大似然估计法估计模型参数。以检测周期和延迟时间为优化变量,以最小费用率为优化目标,得到长期使用下的船舶关键部件机会维修策略。研究结果表明,与单纯的检测维修策略和传统的预防性维修方法相比,该策略能有效降低船舶维修费用,减少停机维修次数,提高船舶的使用效率,为船舶维修提供决策依据和参考。

关键词: 延迟时间, 预防性维修, 机会维修, 检测维修, 极大似然估计

Abstract: A preventive maintenance strategy for key components of ships is advanced based on the delay time theory. This strategy aims at the problem of high maintenance cost and low utilization rate caused by unreasonable maintenance of key parts. It bases on periodic inspection of each component, and divides the maintenance of each component into inspection maintenance and delay maintenance according to the different characteristics of defect and failure stage. And the idea of opportunity maintenance is introduced in the delay phase, to establish an opportunistic maintenance model for the ship’s key components. According to this strategy, the opportunistic maintenance strategy of the key parts under long-term use can be obtained in four steps: Base on component failure data and inspection maintenance records. Estimate model parameters by maximum likelihood estimation. Take detection cycle and delay time as optimization variables. Take the minimum cost ratio as the optimization objective. The result of this research indicates that this strategy can more effectively reduce the cost of ship maintenance, reduce downtime for maintenance, improve the efficiency of the use of the ship, and provide a decision basis and reference for ship maintenance, than the simple test maintenance strategy and traditional preventive maintenance method.

Key words: delay time, preventive maintenance, opportunistic maintenance, inspection maintenance, maximum likelihood estimation

中图分类号: 

  • U664.21
[1] 王子睿. 基于状态的船舶动力系统维修时机决策研究[D]. 武汉: 武汉理工大学, 2016.
[2] GIORGIO M, GUIDA M, PULCINI G. A wear model for assessing the reliability of cylinder liners in marine diesel engines [J]. IEEE Transactions on Reliability, 2007, 56(1): 158-166.
[3] HERMANN S, RUGGERI F. Modeling wear in cylinder liners [J]. Quality and Reliability Engineering International, 2017, 33(4): 839-851.
[4] 杨立乾, 赵金楼, 李根. 基于性能退化的船舶关键部件视情维修策略[J]. 哈尔滨工程大学学报, 2020, 41(4): 613-618.
YANG L Q, ZHAO J L, LI G. Condition-based maintenance strategy for critical components of ships based on performance degradation [J]. Journal of Harbin Engineering University, 2020, 41(4): 613-618.
[5] 孙林凯, 耿俊豹, 金家善, 等. 基于可变周期的船舶预防性维修策略[J]. 船海工程, 2009, 38(1): 97-100.
SUN L K, GENG J B, JIN J S, et al. Preventive maintenance strategy of ship based on variable period [J]. Ship & Ocean Engineering, 2009, 38(1): 97-100.
[6] 李冀晖, 黄锦敬, 韦发清. 基于比例风险模型的船舶状态机会维修策略[J]. 广东海洋大学学报, 2021, 41(5): 122-129.
LI J H, HUANG J J, WEI F Q. Ship state opportunity maintenance strategy based on proportional hazard model [J]. Journal of Guangdong Ocean University, 2021, 41(5): 122-129.
[7] CHRISTER A H, WALLER W M. Delay time models of industrial inspection maintenance problems [J]. Journal of The Operational Research Society, 1984, 35(5): 401-406.
[8] KERRES B, FISCHER K, MADLENER R. Economic evaluation of maintenance strategies for wind turbines: a stochastic analysis [J]. IET Renewable Power Generation, 2015, 9(7): 766-774.
[9] WANG W, CHRISTER A H. Solution algorithms for a nonhomogeneous multi-component inspection model [J]. Computers & Operations Research, 2003, 30(1): 19-34.
[10] JONES B, JENKINSON I, WANG J. Methodology of using delay-time analysis for a manufacturing industry [J]. Reliability Engineering and System Safety, 2009, 94(1): 111-124.
[11] JONES B, JENKINSON I, YANG Z, et al. The use of Bayesian network modeling for maintenance planning in a manufacturing industry [J]. Reliability Engineering and System Safety, 2010(95): 267-277.
[12] 吕文元, 郑睿. 基于时间延迟的维修类型优化组合模型及案例分析[J]. 系统工程理论与实践, 2013, 33(7): 1654-1660.
LYU W Y, ZHENG R. Delay-time-based model of optimization grouping maintenance type and case study [J]. Systems Engineering-Theory & Practice, 2013, 33(7): 1654-1660.
[13] 胡海军, 程光旭, 段权, 等. 一种包含非理想维修的延迟时间模型[J]. 西安交通大学学报, 2009, 43(6): 103-107.
HU H J, CHENG G X, DUAN Q, et al. Delay time model based on imperfect maintenance [J]. Journal of Xi’an Jiaotong University, 2009, 43(6): 103-107.
[14] 刘葛辉, 陈绍宽, 金华, 等. 基于延迟时间模型的不完全检修计划优化模型[J]. 浙江大学学报(工学版) , 2020, 54(7): 1298-1307.
LIU G H, CHEN S K, JIN H, et al. Optimum imperfect inspection and maintenance scheduling model considering delay time theory [J]. Journal of Zhejiang University (Engineering Science) , 2020, 54(7): 1298-1307.
[15] WANG W. An overview of the recent advances in delay-time-based maintenancemodeling [J]. Reliability Engineering & System Safety, 2012, 106(5): 165-178.
[16] 李想, 朱才朝, 李垚, 等. 基于延迟时间模型的风电机组维修策略[J]. 重庆大学学报, 2020, 43(10): 20-28.
LI X, ZHU C C, LI Y, et al. Maintenance strategy of wind turbine based on the delay time model [J]. Journal of Chongqing University, 2020, 43(10): 20-28.
[17] 柏文华, 左洪福, 吕德峰, 等. 基于延迟时间模型的民机部件维修优化方法[J]. 南京航空航天大学学报, 2015, 47(6): 890-896.
BAI W H, ZUO H F, LYU D F, et al. Maintenance optimization method of civil aircraft based on delay time mode [J]. Journal of Nanjing University of Aeronautics & Astronautics, 2015, 47(6): 890-896.
[18] 赵洪山, 鄢盛腾, 刘景青. 基于机会维修模型的风电机组优化维修[J]. 电网与清洁能源, 2012, 28(7): 1-5.
ZHAO H S, YAN S T, LIU J Q. Optimization maintenance of wind turbines based on opportunistic maintenance model [J]. Power System and Clean Energy, 2012, 28(7): 1-5.
[19] 贺德强, 罗安, 邓建新, 等. 列车转向架关键部件预防性维修决策优化模型[J]. 计算机集成制造系统, 2018, 24(5): 1155-1161.
HE D Q, LUO A, DENG J X, et al. Optimization model of preventive maintenance decision-making for train bogie key components [J]. Computer Integrated Manufacturing Systems, 2018, 24(5): 1155-1161.
[20] WANG L, HU H, WANG Y, et al. The availability model and parameters estimation method for the delay time model with imperfect maintenance at inspection [J]. Applied Mathematical Modelling, 2011, 35(6): 2855-2863.
[21] 温正, 孙华克. MATLAB智能算法[M]. 北京: 清华大学出版社, 2017: 145-196.
[1] 何春1 , 方积乾2. 总体平均处理效应的拟极大似然估计的随机模拟[J]. 广东工业大学学报, 2010, 27(2): 65-67.
[2] 何春; 方积乾; . 极大似然估计和拟极大似然估计模拟之比较[J]. 广东工业大学学报, 2006, 23(1): 114-116.
[3] 何春; . 双参数指数分布无失效数据的新的修正极大似然估计[J]. 广东工业大学学报, 2000, 17(4): 103-106.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!