广东工业大学学报 ›› 2007, Vol. 24 ›› Issue (03): 104-108.

• 综合研究 • 上一篇    

剪力墙住宅设计阶段成本的控制方法

  

  1. 宏润建设集团股份有限公司 上海200235;
  • 出版日期:2007-08-10 发布日期:2007-08-10

Cost Control Methods for Shear Wall Residential Buildings in the Design Stage

  1. (Hongrun Construction Group Co.,Ltd,Shanghai 200235,China)
  • Online:2007-08-10 Published:2007-08-10

摘要: 以上海地区三栋剪力墙住宅为对象,针对建筑布置、结构布置、构件设计、材料选用等问题研究其设计阶段的成本控制方法.研究表明,建筑布置和结构布置应简单、规则、对称;剪力墙多采用构造配筋,严格区分墙肢水平钢筋与竖向钢筋、加强层与非加强层的配筋设计;楼板根据跨度不同区分板厚,配筋宜采用分离式;注重结构的分层细化设计;主筋采用III级钢或冷轧钢等,采用这一系列措施能够在设计阶段有效控制剪力墙住宅的工程成本,且重点是在建筑布置和结构布置. 更多还原

关键词: 剪力墙住宅; 设计阶段; 成本控制;

Abstract: With regard to three shear wall residential buildings in Shanghai,cost control methods in the design stage were studied in view of architecture arrangement,structure arrangement,component design and material selection and so on.The study results indicate that some methods can control the cost of shear wall residential buildings in design stage effectively as follows:simple,regular,symmetrical architecture and structure arrangement;construction reinforcement in shear walls,differentiation between...

Key words: shear wall residential building; design stage; cost control;

[1] 包世华,张铜生编著.高层建筑结构设计和计算[M]. 清华大学出版社, 2005

[2] 田振郁主编.工程项目管理实用手册[M]. 中国建筑工业出版社, 1997

[3] 张维斌主编.多层及高层钢筋混凝土结构设计释疑及工程实例[M]. 中国建筑工业出版社, 2005
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!