Journal of Guangdong University of Technology ›› 2018, Vol. 35 ›› Issue (03): 72-78.doi: 10.12052/gdutxb.170176

Previous Articles     Next Articles

An Analysis of BIM Construction Project Risks Using the DEMATEL Model

Liu Jing-kuang, Liu Jian-cheng, Wang Dong, Zhu Jian   

  1. School of Management, Guangzhou University, Guangzhou 510006, China
  • Received:2017-12-20 Online:2018-05-09 Published:2018-05-24
  • Supported by:
     

Abstract: As an advanced integration management platform of building information, BIM has been widely used in the international construction market, and is promoting unprecedented reforms in the construction industry. However, there are still many risks involved in the application of BIM technology in construction projects, such as legal and policy risks, industry risks, organization management risks, technology risks, economy risks, etc. Based on previous studies, the risks are summarized, and the main influential factors of BIM application risks and the causal relationship between different factors are analyzed depending on DEMATEL method. On one hand, a conclusion is drawn that most risks of BIM application lie in the investment income uncertainty of the enterprise from the centrality aspect. On the other hand, it can be concluded that the main factors from the reason degree are the BIM standard, guide defect and lack of domestic BIM software. Finally, some suggestions are provided to reduce the risks of BIM application, such as perfecting the BIM standards and application guidelines, strengthening the BIM technology research and development, improving the BIM contract management and business process, and building BIM professional team, etc.

Key words: BIM technology, risk factor, construction project, DEMATEL method

CLC Number: 

  • C931.2
[1] GOLDBERG H E. AEC from the ground up:the building in formation model[J]. Cadalyst, 2004, 21(11):56-58.
[2] MIGILINSKAS D, POPOV V, JUOCEVICIUS V, et al. The benefits, obstacles and problems of practical BIM implementation[J]. Procedia Engineering, 2013, 57(1):767-774.
[3] ALI G, JOHN T, AMIRHOSEIN G, et al. Building Information Modelling (BIM) uptake:clear benefits, understanding its implementation, risks and challenges[J]. Renewable and Sustainable Energy Reviews, 2017, 75:1046-1053.
[4] AZHAR S, HEIN M, SKETO B. Building Information Modeling (BIM):benefits, risks and challenges[J]. Town Planning Review, 2004, 75(2):231-255.
[5] WON J, LEE G, DOSSICK C. Where to focus for successful adoption of building information modeling within organization[J]. Journal of Construction Engineering and Management, 2013, 139(11):1933-1951.
[6] KU K, TAIEBAT M. BIM experiences and expectations:the constructors' perspective[J]. International Journal of Construction Education & Research, 2011, 7(3):175-197.
[7] ATUL P, KASUN N H. Building Information Modeling (BIM) partnering framework for public construction projects[J]. Automation in Construction, 2013, 31:204-214.
[8] LU Y J, WU Z L, CHANG R D, et al. Building Information Modeling (BIM) for green buildings:A critical review and future directions[J]. Automation in Construction, 2017, 83:134-148.
[9] ROSHANA T, MOHD H, ABDUL H N. Building Information Modeling (BIM):A New Paradigm for Quality of Life Within Architectural, Engineering and Construction (AEC) Industry[J]. Procedia - Social and Behavioral Sciences, 2013, 101:23-32.
[10] ARAYICI Y, COATES P, KOSKELA L, et al. Technology adoption in the BIM implementation for lean architectural practice[J]. Automation in Construction, 2011, 20(2):189-195.
[11] GRILO A, JARDIM-GONCALVES R. Value proposition on interoperability of BIM and collaborative working environments[J]. Automation in Construction, 2010, 19(5):522-530.
[12] AZIZ N D, NAWAWI A H, ARIFF NOR R M. ICT evolution in Facilities Management (FM):Building Information Modelling (BIM) as the latest technology[J]. Procedia - Social and Behavioral Sciences, 2016, 234:363-371.
[13] CHIEN K F, WU Z H, HUANG S C. Identifying and assessing critical risk factors for BIM project:Empirical study[J]. Automation in Construction, 2014, 45:1-15.
[14] BIN Z Z, MOHAMED A N, TARMIZI H A, et al. Exploring the adoption of Building Information Modelling (BIM) in the Malaysian construction industry:a qualitative approach[J]. International Journal of Research in Engineering and Technology, 2013, 2(8):384-395.
[15] MAYO G, GIEL B. BIM use and requirements among building owners[J]. Computing in Civil Engineering, 2012,(6):349-356.
[16] STANDARDED U AEC (UK) BIM Protocol. Implementing UK BIM standards for the architectural[S].London:Engineering and Construction industry, 2012.
[17] 张建新. 建筑信息模型在我国工程设计行业中应用障碍研究[J]. 工程管理学报, 2010, 24(4):387-392.ZHANG J X. Study on barriers of implementing BIM in engineering design industry in China[J]. Journal of Engineering Management, 2010, 24(4):387-392.
[18] 沈翔, 张振生. 业主使用BIM的价值与风险研究[J]. 中国工程咨询, 2015,(6):13-14.SHEN X, ZHANG Z S. The value of the use of BIM owner and risk research[J]. China Engineering Consulting, 2015,(6):13-14.
[19] 张春霞. BIM技术在我国建筑行业的应用现状及发展障碍研究[J]. 建筑经济, 2011,(9):96-98.ZHANG C X. BIM technology in our country's construction industry for the application present situation and development of disabilities[J]. Construction Economy, 2011,(9):96-98.
[20] 李东锋, 陈臻颖. BIM技术在我国的应用现状研究[J]. 安徽建筑, 2014, 21(4):12-13.LI D F, CHEN Z Y. The present situation of the application of BIM technology in our country[J]. Anhui Building, 2014, 21(4):12-13.
[21] 许炳, 朱海龙. 我国建筑业BIM应用现状及影响机理研究[J]. 建筑经济, 2015, 36(3):10-14.XU B, ZHU H L. China's construction BIM application status and influence mechanism research[J]. Construction Economy, 2015, 36(3):10-14.
[22] 何清华, 张静. 建筑施工企业BIM应用障碍研究[J]. 施工技术, 2012, 41(22):80-83.HE Q H, ZHANG J. Study on barriers of Building Information Modeling application in building construction enterprises[J]. Construction Technology, 2012, 41(22):80-83.
[23] 刘波, 刘薇. BIM在国内建筑业领域的应用现状与障碍研究[J]. 建筑经济, 2015, 36(9):20-23.LIU B, LIU W. Application status and obstacles research of BIM in domestic construction industry[J]. Construction Economy, 2015, 36(9):20-23.
[24] 潘佳怡, 赵源煜. 中国建筑业BIM发展的阻碍因素分析[J]. 工程管理学报, 2012, 26(1):6-11.PAN J Y, ZHAO Y Y. Research on barriers of BIM application in China's building industry[J]. Journal of Engineering Management, 2012, 26(1):6-11.
[25] 徐友全, 孔媛媛. BIM在国内应用和推广的影响因素分析[J]. 工程管理报, 2016, 30(2):28-32.XU Y Q, KONG Y Y. Analysis of the influence factors of application and promotion of BIM in China[J]. Journal of Engineering Management, 2016, 30(2):28-32.
[26] 张连营, 李彦伟, 高源. BIM技术的应用障碍及对策分析[J]. 土木工程与管理学报, 2013, 30(3):65-69, 85.ZHANG L Y, LI Y W, GAO Y. Barrier and countermeasures of the BIM application in China[J]. Journal of Civil Engineering and Management, 2013, 30(3):65-69, 85.
[27] KOU G, ERGU D, SHANG J. Enhancing data consistency in decision matrix:adapting Hadamard model to mitigate judgment contradiction[J]. European Journal of Operational research, 2014, 236(1):261-271.
[28] 章玲, 周德群, 汤建影. 基于DEMATEL方法的高等教育教学质量影响因素分析[J]. 南京航空航天大学学报(社会科学版), 2009, 11(1):49-52.ZHANG L, ZHOU D Q, TANG J Y. Based on the DEMATEL method analysis of the higher education teaching quality influence factors[J]. Journal of Nanjing University of Aeronautics and Astronautics (Social Science Edition), 2009, 11(1):49-52.
[29] 张静, 晓崔凡. 发展结果导向的BIM团队学习框架及应用[J]. 科技进步与对策, 2017, 34(9):151-156.ZHANG J, XIAO C F. Results oriented BIM team learning framework for development and application[J]. Scientific and Technological Progress and Countermeasures, 2017, 34(9):151-156.
[1] WU Ju-Hua, GAO Sui, LI Pin-Yi, MO Zan. Exploring Influential Risk Factors of SaaS Adoption from the Perspective of DEMATEL Approach [J]. Journal of Guangdong University of Technology, 2014, 31(4): 26-30.
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!