Journal of Guangdong University of Technology ›› 2007, Vol. 24 ›› Issue (2): 64-68.

• Comprehensive Studies • Previous Articles     Next Articles

Structure Design Analysis for Transition Section of Highway and Bridge

  

  1.  (Faculty of Construction,Guangdong University of Technology,Guangzhou 510090,China)
  • Online:2007-07-02 Published:2007-07-02

Abstract: Combined with the problems of the ununiform settlements met in the subgrade and pavement in transition section of the highway and bridge,it is analyzed and presented that structure design must secure the foundation conditions and subgrade conditions in transition section of the highway and bridge.The study of the soft soil base treatment at the bridge abutment must be strengthened and the suitable stability and settlement measures of the bridge abutment and bridge head must be chosen.

Key words: transition section of the highway and bridge; structure design; settlement;

[1] 王希年,罗志强.  桥头软基路堤设计与施工必须注意的若干问题[J]. 广东工业大学学报. 2003(02)

[2] 罗志强,林川.  汕头海湾大桥北引道软土地基处理[J]. 中南公路工程. 1999(02)
No related articles found!
Viewed
Full text
2218
HTML PDF
Just accepted Online first Issue Just accepted Online first Issue
0 0 0 0 0 2218

  From Others local
  Times 548 1670
  Rate 25% 75%

Abstract
204
Just accepted Online first Issue
0 0 204
  From Others local
  Times 52 152
  Rate 25% 75%

Cited

Web of Science  Crossref   ScienceDirect  Search for Citations in Google Scholar >>
 
This page requires you have already subscribed to WoS.
  Shared   
  Discussed   
No Suggested Reading articles found!