Abstract: When the super high-rise building is extremely high,its upper portion will sway slowly because of the sunshine and some other factors.Under this condition,it is dim cult to employ the conventional method to surevey the plumb datum for the building by laser alignment. It introduces a new method to transfer the construction base for the super high-rise building by geo-robot, and analyses the precision and the feasibility of the method.Finally. it advanees some suggestions on the application of the method.

Key words: super high-rise building;construction base transfer;geo-robot

[1]GB50204—2002,混凝土结构工程施工质量验收规范[S].北京:中国建筑工业出版社,2002.

[2]覃辉,叶海青.土木工程测量[M].上海:同济大学出版社.2005.

[3]吴来瑞,邓学才.建筑施工测量手册[M].北京:中国建筑工业出版社,2002.

[4]巢佰崇,陈雪丰,潘正风.新型数字式遥测垂线仪应用研究[J].测绘信息与工程,2001(3):44-47.

[5]黄声享,柳响林.GPS定位技术在高层建筑施工基准传递中的应用[J].测绘工程,200l(1):37-40.

[6]张宏胜,姚刚.GPS在超高层建筑施工测量中应用研讨[J].重庆建筑大学学报,2000(3):122-124.

[7]JGJ8—2007,建筑变形测量规范[s].北京:中国建筑工业出版社,2007.

[8]张正禄,测量机器人[J],测绘通报,2001(5):17-17。

[9]王字会,蒋利龙。用GeoCOM对测量机器人进行在线控制[J].广东工业大学学报,2009(2):61-63.

[10]孔祥元,郭际明.控制测量学上册[M].武汉:武汉大学出版社,2006.
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!